    And with video..!

    http://cooln.kr/bbs/review/711830
    https://quasarzone.co.kr/bbs/board.p...rt&wr_id=67314

    Whaaat? contract with Corsair this year?
    Last edited by rgbodosk; 07-22-2019 at 07:06 AM.

  2. #2
    Join Date
    Jul 2011
    Location
    Germany, Berlin
    Posts
    1,622
    Thanks Thanks Given 
    976
    Thanks Thanks Received 
    31
    Thanked in
    25 Posts

    Default

    Well, if there is a contract they probably have violated NDA

  3. #3
    Join Date
    Aug 2018
    Location
    Korea
    Posts
    267
    Thanks Thanks Given 
    132
    Thanks Thanks Received 
    13
    Thanked in
    10 Posts

    Default

    Quote Originally Posted by Philipus II View Post
    Well, if there is a contract they probably have violated NDA
    How is Andyson factory compared to others?

  4. #4
    Join Date
    Oct 2017
    Location
    Grand Junction, CO
    Posts
    1,983
    Thanks Thanks Given 
    114
    Thanks Thanks Received 
    55
    Thanked in
    48 Posts

    Default

    Many thanks for posting this; most impressive.

  5. #5
    Join Date
    Oct 2006
    Location
    jonnyGURU forums, of course!
    Posts
    16,129
    Thanks Thanks Given 
    542
    Thanks Thanks Received 
    284
    Thanked in
    204 Posts

    Default

    Quote Originally Posted by rgbodosk View Post
    Whaaat? contract with Corsair this year?
    I wonder when they did this interview. Corsair talked to them last year, but the factory didn't meet the audit. There was no contract.

    Quote Originally Posted by rgbodosk View Post
    How is Andyson factory compared to others?


    It's ok. Like I said, it failed Corsair's audit. But since then they installed a second set of burn in chambers and put in a shop floor system, so they're much closer to being the kind of factory Corsair would use.



  6. #6
    Join Date
    Aug 2018
    Location
    Korea
    Posts
    267
    Thanks Thanks Given 
    132
    Thanks Thanks Received 
    13
    Thanked in
    10 Posts

    Default

    Quote Originally Posted by Jon Gerow View Post
    I wonder when they did this interview. Corsair talked to them last year, but the factory didn't meet the audit. There was no contract.
    When:
    July 4, 2019.

    From the interview:
    Q) How long since Andyson worked with major global brands?
    A) Andyson revamped their facilities since 2013 to nowdays. A year after 2013, we cooperated with Rosewill, then another year later Antec and later EVGA... And this year we are cooperating with Corsair.

    and also mentioned:
    'Corsair HQ visited Andyson factory this year'
    'New Corsair products will be shown in 2019 second half'
    Last edited by rgbodosk; 07-22-2019 at 11:57 AM.

  7. #7
    Join Date
    Oct 2006
    Location
    jonnyGURU forums, of course!
    Posts
    16,129
    Thanks Thanks Given 
    542
    Thanks Thanks Received 
    284
    Thanked in
    204 Posts

    Default

    Quote Originally Posted by rgbodosk View Post
    When:
    July 4, 2019.

    From the interview:

    Q) How long since Andyson worked with major global brands?

    A) Andyson revamped their facilities since 2013 to nowdays. A year after 2013, we cooperated with Rosewill, then another year later Antec and later EVGA... And this year we are cooperating with Corsair.

    and also mentioned:

    'Corsair HQ visited Andyson factory this year'
    'New Corsair products will be shown in 2019 second half'
    They did the interview in July 4th????

    If that's true, he's just bold face lying.

  8. The Following 2 Users Say Thank You to Jon Gerow For This Useful Post:

    GDILord (07-22-2019), Philipus II (07-22-2019)

  9. #8
    Join Date
    Jul 2011
    Location
    Germany, Berlin
    Posts
    1,622
    Thanks Thanks Given 
    976
    Thanks Thanks Received 
    31
    Thanked in
    25 Posts

    Default

    I've been to Andyson factory in early 2017. The place saw some serious upgrades in the last few years. It's definately one of the better factories, but I'd be careful with bringing large volume there because it's quite small. Bringing very large volume to rather small factory can bring you into all sorts of trouble. For example, the burn in time can be specified for each product. However if factory has rather small burn in capacity they need other customers to accept lower burn in time to avoid semi-finished goods piling up. I've also seen factories running burn in on sundays or longer than regular factory operating hours. For a lot of other potential bottlenecks it's similar. For a small or medium sized customer those bottlenecks aren't any problem, but for a large global scale brand like Corsair it will be at some point.

  10. The Following User Says Thank You to Philipus II For This Useful Post:

    rgbodosk (07-22-2019)

  11. #9
    Join Date
    Oct 2006
    Location
    jonnyGURU forums, of course!
    Posts
    16,129
    Thanks Thanks Given 
    542
    Thanks Thanks Received 
    284
    Thanked in
    204 Posts

    Default

    Quote Originally Posted by Philipus II View Post
    I've been to Andyson factory in early 2017. The place saw some serious upgrades in the last few years. It's definately one of the better factories, but I'd be careful with bringing large volume there because it's quite small. Bringing very large volume to rather small factory can bring you into all sorts of trouble. For example, the burn in time can be specified for each product. However if factory has rather small burn in capacity they need other customers to accept lower burn in time to avoid semi-finished goods piling up. I've also seen factories running burn in on sundays or longer than regular factory operating hours. For a lot of other potential bottlenecks it's similar. For a small or medium sized customer those bottlenecks aren't any problem, but for a large global scale brand like Corsair it will be at some point.
    \

    You are exactly correct. That's why they just doubled the burn in capacity. They were only willing to burn in for half the time Corsair required previously. And they would need to do three shifts to keep up with Corsair's volume, so they would only be allowed to a regional SKU if Corsair were to use them.

  12. #10
    Join Date
    Aug 2018
    Location
    Korea
    Posts
    267
    Thanks Thanks Given 
    132
    Thanks Thanks Received 
    13
    Thanked in
    10 Posts

    Default

    Andyson claims that they manufacture 100K~120K PSUs each month(max 150K), I thought it was quite a lot - then how much the T1 or T2 companies produce... or Corsair sales each month? 500K? 1M?

Posting Permissions